Clearance and bridges
Equipment height on the lowbed can change the route, so measuring the machine alone is not enough.
- Machine height
- Trailer deck height
- Bridge and sign clearance
- Gate restrictions
Loading and unloading sites
The road may be suitable while the site is not ready, so space, slopes, and maneuvering points are reviewed.
- Turning area
- Ground bearing
- Entry slope
- Support equipment availability
Quick Summary
- What is reviewed
- Clearance, turns, bridges, entry and exit points, and the unloading site.
- When it matters
- For long, wide, tall cargo, or restricted project site access.
- Customer input
- Accurate pickup and delivery location plus access photos or maps when available.
Required Data
- Site pin
- Expected total height
- Width and length
- Gate photos
- Movement time
- Site security limits
Route study for heavy equipment transport to review access, clearances, loading points, and delivery constraints before lowbed movement.